Today was my second visit to CaB since back in HMB. All I did was bring back the A1.5, the flying fish spinnaker, the fractional code 0, the masthead code 0, the gennaker, and the jib top. I also motored out to get the engine going and get some water flowing on the hull, like I did last week. Last week I also rinsed the deck and tightened up the D1 one turn as I noticed that they were slack on the leeward side when we sailed upwind coming back from the repair.
I’m still struggling with what to do next. I did some writing but honestly, nothing is clear. I need to go sailing, that I know. Re-connect with CaB.