Thank you to Dave for coming down to Pillar Point Harbor this morning and taking us through the SHTP inspection. We’re a go with the usual pre-race inspection: comms, water, food. And I need a non expired life raft.
I went up the mast to rig the new fractional halyard. I’ve also put it on a reeving line so it’s not cooking in the sun all day.


I was planning to rig the spare masthead halyard but I discovered that the sheave is damaged. I’ll have to replace it first.

Hopefully it’ll be easier then when I had to replace the jib sheave!